The many steps to complete all the firewall forward components for the RV-14A. This includes components such as oil and fuel lines, air cooling baffles, the exhaust system, engine sensors, passenger heating, oil cooler installation, and others.
The many steps to complete all the firewall forward components for the RV-14A. This includes components such as oil and fuel lines, air cooling baffles, the exhaust system, engine sensors, passenger heating, oil cooler installation, and others.
In early January 2025 it was time to pull out that beautiful propeller and get it mounted onto the engine.
This post covers the manufacture, delivery, and installation of the engine for the RV-14A over the period of October 2024 through December 2024.