Tag: PEX

Footings excavated

Construction Begins – November 2014

Construction of the foundation completed in November.   Before pouring the slab, I ran all the 5/8″ PEX lines that will be used to heat the first floor through hot water.   Here you can see the manifold.  It is pressurized so I can tell if any leaks occur during the pouring of the slab   The slab required 20…

Continue reading