Footings excavated

Construction Begins – November 2014

Construction of the foundation completed in November.

Foundation walls completed

 

Before pouring the slab, I ran all the 5/8″ PEX lines that will be used to heat the first floor through hot water.

PEX installation on first floor complete

 

Here you can see the manifold.  It is pressurized so I can tell if any leaks occur during the pouring of the slab

PEX lines going into the slab manifold

 

The slab required 20 yards of concrete and it dried very quickly as winterizer was added not knowing the concrete plant had just switched to their winter mix

Slab completed

Framing begin nearly immediately after

 